{"id":12372,"date":"2022-08-02T08:39:27","date_gmt":"2022-08-02T12:39:27","guid":{"rendered":"https:\/\/canadianferry.ca\/?page_id=12372"},"modified":"2022-08-02T08:39:30","modified_gmt":"2022-08-02T12:39:30","slug":"heddle-shipyards","status":"publish","type":"page","link":"https:\/\/canadianferry.ca\/fr\/heddle-shipyards\/","title":{"rendered":"Heddle Shipyards"},"content":{"rendered":"<p class=\"has-text-align-center has-small-font-size\"><strong><em>Supplier Member of the Month<\/em><\/strong> allows one CFA Supplier member per month to highlight their business.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"540\" src=\"https:\/\/canadianferry.ca\/wp-content\/uploads\/CFA-MoM-Highlight-JUne-2022.jpg\" alt=\"\" class=\"wp-image-12312\" srcset=\"https:\/\/canadianferry.ca\/wp-content\/uploads\/CFA-MoM-Highlight-JUne-2022.jpg 960w, https:\/\/canadianferry.ca\/wp-content\/uploads\/CFA-MoM-Highlight-JUne-2022-300x169.jpg 300w, https:\/\/canadianferry.ca\/wp-content\/uploads\/CFA-MoM-Highlight-JUne-2022-768x432.jpg 768w, https:\/\/canadianferry.ca\/wp-content\/uploads\/CFA-MoM-Highlight-JUne-2022-18x10.jpg 18w\" sizes=\"auto, (max-width: 960px) 100vw, 960px\" \/><\/figure>\n<\/div>\n\n\n<hr class=\"wp-block-separator has-css-opacity\"\/>\n\n\n\n<div style=\"height:19px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div style=\"height:36px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong>SIMCOE ISLANDER II CABLE FERRY UNDER CONSTRUCTION AT THE HAMILTON SHIPYARD<br><\/strong><\/p>\n\n\n\n<p>In November of 2021, Heddle Shipyards was awarded the new build contract for the Simcoe Islander II Cable ferry for the Frontenac township, and we are thrilled to report that construction is well underway at our Hamilton Shipyard.<\/p>\n\n\n\n<p>The Simcoe Islander II Cable Ferry new build represents the first large Ontario government vessel built in an Ontario shipyard since 2004 when Heddle Shipyards constructed the Howe Island cable ferry, still in service today. Since 2016, Heddle Shipyards has been revitalizing the ship repair and construction industry in Ontario and the Simcoe Islander II new build project is just another step towards re-establishing Ontario as a shipbuilding titan in Canada.<\/p>\n\n\n\n<p>The Frontenac Islands Township will operate the Simcoe Islander II, and the vessel will serve as a critical transportation link between Wolfe and Simcoe Island. The new cable ferry will replace the existing vessel, initially launched in 1963, with a modern platform that will nearly triple the existing capacity of the Wolfe to Simcoe Island route. The $3.3 million investment by the Ontario Government for the new ferry will ensure residents and visitors have reliable access to the island, and it will allow for larger vehicles and increased traffic volumes. The larger capacity ferry will support the increasing volume of tourists to the area and create opportunities for the local economy.<\/p>\n\n\n\n<p>New build projects such as the Simcoe Islander II are critical for re-building the capacity of Ontario shipyards to compete for major shipbuilding contracts, and we are incredibly grateful to the Ontario Government for their commitment to revitalizing the shipbuilding industry in Ontario. Not only has the project created and sustained skilled trades jobs at the Hamilton Shipyard, but it has allowed Heddle to grow as an organization through training and upskilling our people. &nbsp;<\/p>\n\n\n\n<p>\u201cThere is a tremendous amount of opportunity in the coming decades for new build vessels, specifically in the under 1000GT market,\u201d said Director of Business Development Ted Kirkpatrick. \u201cThat being said, we need to foster the next generation of Ontario shipbuilders to bring that work to Ontario and the Simcoe Islander II project is allowing us to do that. Although we still have a long way to go, this project has shown that we can, and we will bring shipbuilding back to Ontario.\u201d<\/p>\n\n\n\n<div style=\"height:18px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"708\" src=\"https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-1024x708.jpg\" alt=\"\" class=\"wp-image-12314\" srcset=\"https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-1024x708.jpg 1024w, https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-300x208.jpg 300w, https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-768x531.jpg 768w, https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-1536x1063.jpg 1536w, https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-2048x1417.jpg 2048w, https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-18x12.jpg 18w, https:\/\/canadianferry.ca\/wp-content\/uploads\/DJI_0418-scaled.jpg 2560w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Contact Us<\/h3>\n\n\n\n<p>Website: <a rel=\"noreferrer noopener\" href=\"https:\/\/heddleshipyards.com\/\" target=\"_blank\">heddleshipyards.com<\/a><br>Linked in: <a rel=\"noreferrer noopener\" href=\"https:\/\/www.linkedin.com\/company\/heddleshipyards\/\" target=\"_blank\">heddleshipyards<\/a><br>Instagram: <a rel=\"noreferrer noopener\" href=\"https:\/\/www.instagram.com\/heddleshipyards\/\" target=\"_blank\">@heddleshipyards<\/a><br>Twitter: <a rel=\"noreferrer noopener\" href=\"https:\/\/twitter.com\/HShipyards\" target=\"_blank\">@HShipyards<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Supplier Member of the Month allows one CFA Supplier member per month to highlight their business. SIMCOE ISLANDER II CABLE FERRY UNDER CONSTRUCTION AT THE HAMILTON SHIPYARD In November of 2021, Heddle Shipyards was awarded the new build contract for the Simcoe Islander II Cable ferry for the Frontenac township, and we are thrilled to [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"class_list":["post-12372","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/pages\/12372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/comments?post=12372"}],"version-history":[{"count":1,"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/pages\/12372\/revisions"}],"predecessor-version":[{"id":12373,"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/pages\/12372\/revisions\/12373"}],"wp:attachment":[{"href":"https:\/\/canadianferry.ca\/fr\/wp-json\/wp\/v2\/media?parent=12372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}